Our Experience

We are committed to creating an extraordinary and unforgettable experience for our clients.

Our Experience

We bring years of experience to provide accurate and reliable solutions for every client.

PLTU SEBALANG – LAMPUNG - 2009 :

Vertical Turbine Pump

Total capacity : 12,900 LPS (46,400 m3/hr) - 3600 kW

Vertical Turbine Pumps. Total capacity : 12,900 LPS (46,400 m3/hr) - 3600 kW

PT Indah Kiat Pulp & Paper - Perawang Mill

PT Indah Kiat pulp

Perawang Mill, Wastewater Capacity : 330,000 m3/day (the largest wastewater water treatment in Indonesia). Total Aerators supplied - 137 units - 5000 kW :

Wastewater Capacity : 330,000 m3/day

PT Lontar Papyrus Pulp & Paper - Jambi

Wastewater Treatment

Wastewater Treatment Capacity : 110,000 m3/day - Total Aerators Supplied : 40 units - 1000 kW

PT Pabrik Kertas Tjiwi Kimia

PT Pabrik Kertas Tjiwi Kimia - Total Aerators supplied : 20 units - 750 kW

PT Indah Kiat Pulp & Paper - Tangerang Mill

PT Indah Kiat Pulp & Paper - Tangerang Mill : 6 unis - 150 HP:

PT Indah Kiat Pulp & Paper - Perawang Mill

Total Raw Water Pumping Capacity for Intake 1, 2, and 3 : 50,000 - 60,000 m3/hr - (The biggest raw water pumping capacity in Indonesia)15 units with Total 3250 kW, installed since 2001 :

Intake Loa Kulu - East Kalimantan

Intake Loa Kulu - East Kalimantan - Total 4 units : 1275 L/S @ 66 meter, the oldest of big raw water intake in Kalimantan which has been operating since 2002 until now :

Intake Cikokol - PDAM Tangerang

Intake Cikokol - PDAM Tangerang : 4 pumps @ 600 LPS per pump, installed since 2006:

PT Astra Agro Lestari - South Kalimantan

PT Astra Agro Lestari - South Kalimantan - Total Pumping Capacity : 41,000 LPS - The biggest flood control system in Indonesia :

Raw Water Intake Pumping Station in Mandalika, Lombok

Raw Water Intake Pumping Station in Mandalika, Lombok : Vertical Turbine Pumps 480 LPS @ 100 meter + Horizontal Split Casing Pumps 480 LPS @ 150 meter. All the pumps are pumping the water through the pipeline for more than 20 km and high elevation. The highest head of pumping systems in Nusa Tenggara Barat with total dynamic head : 250 meter ( 100 m + 150 m):

Raw Water Intake Titab in Bali

Raw Water Intake Titab in Bali - Total Raw Water Pumping Capacity : 2520 m3/hr @ 200 meter - 2170 kW ( the highest head in Bali) :